极品YIN荡合集TXT,国产精品久久久久久软件,色橹橹欧美午夜精品福利,大鸡吧使劲操逼真人视频

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.0668uu.com/

地址:山東省濟南市章丘圣井工業(yè)園

當前位置: 首頁 > 新聞中心 > 公司新聞

通道及施工電梯防護棚要求要求

來源:http://www.0668uu.com/   發(fā)布時間:2021-11-18

1塔吊半徑以內(nèi)所有后臺制作加工、攪拌區(qū)必須搭設(shè)雙層防護棚。

1. All backstage fabrication, processing and mixing areas within the radius of tower crane must be provided with double-layer safety protection sheds.
2.操作場所掛設(shè)的標志牌有:機械驗收合格牌、警示牌、操作規(guī)程。標牌 的掛設(shè)高度為離地面 2.6 m標志牌規(guī)格為寬600mm*高800mm.
2. The signboards hung at the operation site include: Qualified Mechanical acceptance board, safety warning board and operation procedures. The hanging height of the sign is 2.6 m above the ground, and the specification of the sign is 600mm wide * 800mm high
3.地面必須進行砼硬化厚200mm,設(shè)置4L滅火器 2 只。開關(guān)箱與機械的水平 間距不得大于 3 m。
3. The ground must be hardened with concrete thickness of 200mm, and 2 4L fire extinguishers shall be set. The horizontal distance between the switch box and the machinery shall not be greater than 3 m.
4.雙層防護棚,兩層之間高度800mm,面層用噴繪布噴繪制成,正面為防護 棚名稱和標志牌,其余三面采 用警示標語。
4. The double-layer protective shed has a height of 800mm between the two layers. The surface layer is made of spray-painted cloth. The front side is the name of the protective shed and safety signs, and the other three sides are provided with safety warning slogans.
木工加工棚
5.加工棚名稱及標語字高為400mm,長度根據(jù)尺寸現(xiàn)場均勻布置。
5. The name of the processing shed and the safety slogan are 400mm high, and the length is evenly arranged on site according to the size.
6.標志牌:寬 400mm*高500mm
6. Safety signboard: 400mm wide * 500mm high
7.基礎(chǔ)施工前應(yīng)先視現(xiàn)場地質(zhì)情況做地基處理,處理方法可采用夯實、換填石 料等,必須保證其密實度
7. Before foundation construction, foundation treatment shall be carried out according to the site geological conditions. The treatment methods can be tamping, replacement of stones, etc., and its compactness must be ensured
8.立桿采用22#工字鋼立柱刷紅色油漆,每榀寬度5m,高3m。如施工現(xiàn)場場地不足,可以按5m每榀自行調(diào)整做法,但須經(jīng)現(xiàn)場技術(shù)人員同意。
8. The vertical pole adopts 22# I-steel, and the column is painted with red paint. Each frame is 5m wide and 3M high. If the construction site is insufficient, the method can be adjusted according to 5M each frame, but it must be approved by the on-site technicians.
9.圖中標注為焊接的地方如無特殊說明的,均作滿焊處理 ,現(xiàn)場安裝前應(yīng)對各 構(gòu)件焊接質(zhì)量進行驗收
9. The places marked as welding in the drawing shall be fully welded unless otherwise specified. The welding quality of each component shall be accepted before on-site installation
10.鋼筋加工機具應(yīng)獨立配置開關(guān)箱,開關(guān)箱中心離地面高度為1.5m. 11.軟弱基礎(chǔ)及受臺風(fēng)影響地區(qū)須增設(shè)拉錨。
10. Rebar processing machines and tools shall be equipped with switch box independently, and the height from the center of the switch box to the ground shall be 1.5m. 11. Pull anchors shall be added in weak foundation and typhoon affected areas.

免费无码又爽又刺激高潮的APP| 我把护士日出水了视频90分钟| 日本少妇被爽到高潮无码| 工口里番全彩无遮挡无码| 老熟女五十路乱子交尾中出一区 | 日本VA欧美VA欧美VA精品| 99国产精品白浆在线观看免费| 男女做爰猛烈叫床爽爽小说| 强行挺进朋友漂亮的娇妻| av网站大全| 久久精品国产欧美激情无码| 日韩精品无码人妻一区二区三区| 给我免费播放片高清在线观看 | 麻豆妓女爽爽一区二区三| 女教师被内谢流白浆| 撒尿BBWBBWBBW毛| 女人自己扒开荫道口视频| 两个小婕子和我做受hd| 亚洲一区二区三区av无码| 伸进去摸老妇的毛| 亚洲成A人片在线观看中文| 和尚吮她的花蒂和奶水视频 | 丰满浓毛的大隂户视频| 黑人巨大JEEP日本人| 台湾佬中文娱乐网| 色欲av永久无码精品无码蜜桃| 玩丰满熟妇XXXX视频| 又粗又爽高潮午夜免费视频| 人妻少妇精品一区二区三区| 互换娇妻爽文100系列| 亚洲6080yy久久无码国产| 99久久综合精品五月天| 欧美变态口味重另类在线视频 | 亚洲国产精品无码中文在线| 老板把我抱到办公室揉我胸视频| 国产+高潮+白浆| 久久九九精品国产综合喷水 | 亚洲日本va中文字幕久久道具| 吸咬奶头狂揉60分钟视频| 日本道二区高清视频| 被男狂揉吃奶胸60分钟视频|